Skip to content
Arkenova
Clean Energy Solutions
ArkenovaArkenova
  • Services
    • Engineering facilities
    • Renewable Energy Consulting and Training
    • System monitoring and integration
  • Projects
    • Engineering
    • Consultancy
    • Eficiency
    • Renewables
    • HVAC Systems
    • Aerothermy
    • Monitoring
  • About us
    • Arkenova
    • Our partners
  • News
  • Contact
  • enEnglish
    • esSpanish
    • caCatalan
 
TwitterLinkedin
  • Services
    • Engineering facilities
    • Renewable Energy Consulting and Training
    • System monitoring and integration
  • Projects
    • Engineering
    • Consultancy
    • Eficiency
    • Renewables
    • HVAC Systems
    • Aerothermy
    • Monitoring
  • About us
    • Arkenova
    • Our partners
  • News
  • Contact
  • enEnglish
    • esSpanish
    • caCatalan
View allEngineeringConsultancyEficiencyRenewablesHVAC SystemsAerothermyMonitoring
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona
Instalación híbrida fotovoltaica/eólica en la calle Tenerife de Barcelona

PV & wind hybrid installations on Tenerife street in Barcelona

CLIENT: AGENCIA DE LA ENERGÍA DE BARCELONA
LOCATION: BARCELONA
DATE: 2015

Arkenova was hired by the “Agència de l’Energia de Barcelona” in order to redesign the improvement works of Tenerife Street in Barcelona. The works included a hybrid solar photovoltaic-wind power system with battery storage. Additionally, the current outdoor illumination was replaced by LED technology which was powered by the renewable energy system.

Agencia Energia
Category: Engineering, Renewables14 January, 2018
Share this Project
Share with LinkedInShare with TwitterShare with FacebookShare with Google+Share with WhatsApp

  • ZoomDetails

    Design project of a solar thermal system for a residential building located in Barcelona

    Renewables20 March, 2019
  • ZoomDetails

    Design project of a solar charging station for EV located in Prat de Llobregat

    Renewables19 March, 2019
  • ZoomDetails

    Solar charging station for EV with a Vehicle-to-Grid (V2G) charging point located in Sant Just Desvern

    Renewables19 March, 2019
  • ZoomDetails

    Solar thermal re-engineering for the building of the local police located in Gràcia district (Barcelona)

    Engineering, Renewables, Monitoring6 March, 2019
  • ZoomDetails

    Solar thermal re-engineering for the sport centre Josep Comellas located in Gràcia district (Barcelona)

    Engineering, Renewables, Monitoring5 March, 2019
Arkenova
  • Contact

    Parc Tecnològic Barcelona Nord
    C/ Marie Curie 8-14
    08042 Barcelona
    T: +34 93 143 71 58
    info@arkenova.coop

  • About Us

    Arkenova is a cooperative company with more than 10 years of experience in the renewable energy field. We share the passion for applying our cooperative values and principles to every project we carry out, encouraging the use of clean energies with respect and environmental awareness, always combining the criteria of innovation and efficiency.

Sígueme en Twitter
My Tweets
  • Services
    • Engineering facilities
    • Renewable Energy Consulting and Training
    • System monitoring and integration
  • Projects
    • Engineering
    • Consultancy
    • Eficiency
    • Renewables
    • HVAC Systems
    • Aerothermy
    • Monitoring
Contact




I have read and I accept the Privacy policy

Cookies and privacy: This site uses cookies. To learn more, and to learn how to remove or block this, look here: Our cookie policy
Arkenova
  • About us
  • Projects
  • Privacy Police / Legal Notice
  • Cookies Policy
Legal Notice & Privacy Police
Go to Top