Design projects of systems for a winery located at Avinyonet del Penedès

View allEngineeringConsultancyEficiencyRenewablesHVAC SystemsAerothermyMonitoring Design projects of systems for a winery located at Avinyonet del Penedès CLIENT: LABOQUERIA SCCL PROPERTY DEVELOPER: RAMÓN RAVENTÓS VITICULTORS SL LOCATION: AVINYONET DEL PENEDÈS DATE: 2018 Arkenova was responsible for designing all systems of a new winery located at Avinyonet del Penedès (Barcelona). The building consists of 3 floors and the design projects…

Design projects of systems for the residential building “La Balma”

View allEngineeringConsultancyEficiencyRenewablesHVAC SystemsAerothermyMonitoring Design projects of systems for the residential building "La Balma" CLIENT: LACOL SCCL PROPERTY DEVELOPER: SOSTRE CÍVIC SCCL LOCATION: BARCELONA DATE: 2018 Arkenova was responsible for designing all systems of a residential building called "La Balma" property of the cooperative housing Sostre Cívic SCCL. The building consists of 20 housing units and several common areas. All…

Design projects of systems for La Comunal SCCL

View allEngineeringConsultancyEficiencyRenewablesHVAC SystemsAerothermyMonitoring Design projects of systems for La Comunal SCCL CLIENT: LACOL SCCL PROPERTY DEVELOPERS: FACERAS SL and La Comunal SCCL LOCATION: BARCELONA DATE: 2017-2019 Arkenova was responsible for designing all systems of a remodilling of several existing industrial units located in Sants district (Barcelona). This remodelling also includes the construction of a new office building and…

Efficient illumination at “Reina Elisenda” municipal fencing center

View allEngineeringConsultancyEficiencyRenewablesHVAC SystemsAerothermyMonitoring Efficient illumination at “Reina Elisenda” municipal fencing center CLIENT: INSTITUT BARCELONA ESPORTS LOCATION: BARCELONA DATE: 2016 Arkenova took charge of designing the implementation of an efficient illumination system with LED technology for “Reina Elisenda” Municipal Center of Fencing. Once the simulation results were analyzed, Arkenova executed the replacement of lights. Afterwards, new light levels were…

Efficient illumination at “Reina Elisenda” municipal table tennis center

View allEngineeringConsultancyEficiencyRenewablesHVAC SystemsAerothermyMonitoring Efficient illumination at “Reina Elisenda” municipal table tennis center CLIENT: INSTITUT BARCELONA ESPORTS LOCATION: BARCELONA DATE: 2016 Arkenova carried out the implementation of an efficient illumination system with LED technology for “Reina Elisenda” Municipal Ping-Pong Center. Once the simulation results were analyzed, Arkenova executed the replacement of lights. Afterwards, current light levels were measured in…

Energy efficiency applied to “Les Corts” cemetery (Barcelona)

View allEngineeringConsultancyEficiencyRenewablesHVAC SystemsAerothermyMonitoring Energy efficiency applied to “Les Corts” cemetery (Barcelona) CLIENT: AGENCIA DE LA ENERGÍA DE BARCELONA LOCATION: BARCELONA DATE: 2014 Arkenova was hired by the “Agència de l’Energia de Barcelona” with the aim of carrying out the design project and project management tasks of the energy efficiency improvement plan of “Les Corts” Cemetery. The projects to…

Energy Efficiency applied to the library “Joan Miró” (Barcelona)

View allEngineeringConsultancyEficiencyRenewablesHVAC SystemsAerothermyMonitoring Energy Efficiency applied to the library “Joan Miró” (Barcelona) CLIENT: AGENCIA DE LA ENERGÍA DE BARCELONA LOCATION: BARCELONA DATE: 2015 Arkenova was hired by the “Agència de l’Energia de Barcelona” with the aim of carrying out the design project and project management tasks of the energy efficiency improvement plan of the library “Joan Miró”. The…

Design projects and project management of the systems of the residential building “La Borda”

View allEngineeringConsultancyEficiencyRenewablesHVAC SystemsAerothermyMonitoring Design projects and project management of the systems of the residential building “La Borda” CLIENT: LACOL SCCL PROPERTY DEVELOPER: LA BORDA SCCL LOCATION: BARCELONA DATE: 2015 - 2018 Arkenova was responsible for designing all systems of a residential building property of a housing cooperative called “La Borda”. The building consists of 28 housing units and several…

Energy Efficiency applied to the crematorium of Montjuïc

View allEngineeringConsultancyEficiencyRenewablesHVAC SystemsAerothermyMonitoring Energy Efficiency applied to the crematorium of Montjuïc CLIENT: CEMENTIRIS DE BARCELONA LOCATION: BARCELONA DATE: MARCH-NOVEMBER 2016 Arkenova carried out an innovative energy efficiency project in the Crematorium of Montjuïc which included a heat recovery system using the fumes coming from the crematory ovens, an absorption cooling system, a system of air renovation and distribution…